Design Manager - Commercial Solar

Myriad Products
Full-timeMelton, United Kingdom
Apply Now

📍 Job Overview

Job Title: Design Manager - Commercial Solar PV

Company: Myriad Products

Location: Melton Mowbray, Leicestershire, United Kingdom

Job Type: Full-time

Category: Operations - Engineering & Design Management (Renewable Energy Sector)

Date Posted: 2026-09-17

Experience Level: Mid-Senior Level (5-10 years)

Remote Status: Hybrid

🚀 Role Summary

  • Lead the commercial solar PV design function, ensuring high-quality output from concept to completion.

  • Act as the technical authority, setting and maintaining design standards across a growing portfolio of projects.

  • Collaborate closely with operations and project delivery teams to ensure seamless project execution and compliance.

  • Drive process optimization within the design function, focusing on efficiency, accuracy, and adherence to regulatory frameworks.

  • Utilize advanced design tools and workflows, including Revit and IFC, to deliver buildable and compliant solar solutions.

📝 Enhancement Note: This role is positioned as a technical leadership opportunity within the renewable energy sector, specifically focusing on the management and execution of commercial solar PV design. The emphasis is on bridging the gap between technical design excellence and operational project delivery, requiring a candidate who can influence and standardize design processes across multiple projects.

📈 Primary Responsibilities

  • Oversee and coordinate the design output for multiple concurrent commercial solar PV projects, ensuring timely and accurate delivery.

  • Produce and meticulously review detailed designs utilizing Revit and IFC-based workflows, ensuring constructability and adherence to project specifications.

  • Guarantee that all designs rigorously comply with relevant industry standards, grid connection requirements, and national/local regulatory frameworks.

  • Develop, maintain, and continuously improve Myriad's internal design standards, processes, and documentation, including single-line diagrams, equipment schedules, string layouts, shading analysis, and yield assessments.

  • Facilitate a smooth and efficient handover of design documentation and specifications to the project and construction delivery teams.

  • Provide expert technical support for the resolution of queries, conduct thorough design reviews, and actively participate in value engineering exercises to optimize project outcomes.

  • Act as the primary point of technical contact for design-related matters, liaising effectively with internal teams, clients, and external stakeholders.

  • Implement and refine design processes to enhance efficiency, reduce errors, and ensure the highest quality of technical output for commercial solar installations.

📝 Enhancement Note: The responsibilities highlight a blend of technical design execution and managerial oversight. The emphasis on "maintaining and developing Myriad's design standards, processes and documentation" indicates a strategic operational component, requiring the candidate to not only perform design tasks but also to improve the underlying systems and methodologies for design delivery.

🎓 Skills & Qualifications

Education: While no specific degree is listed, a strong technical background in Electrical Engineering, Renewable Energy Systems, or a related field is implied. Relevant professional certifications in solar design or project management would be advantageous.

Experience:

  • Minimum of 5-10 years of proven design experience within the construction industry.

  • Substantial experience in solar PV design, with a focus on commercial and industrial-scale projects.

  • Demonstrated experience in managing design processes and output across multiple concurrent projects.

  • Experience in a technical leadership or management role is highly desirable. Required Skills:

  • Solar PV Design Expertise: Deep understanding of solar PV system design principles, components, and best practices for commercial installations.

  • Revit Proficiency: Advanced skills in using Revit for BIM (Building Information Modeling) and detailed design documentation.

  • IFC Workflows: Strong command of IFC (Industry Foundation Classes) and BIM collaboration protocols for seamless project data exchange.

  • Design Management: Proven ability to oversee, coordinate, and ensure the quality of design work across multiple projects simultaneously.

  • Technical Standards & Compliance: Thorough knowledge of UK solar PV regulations, grid connection standards (e.g., G98/G99), and construction compliance requirements.

  • Documentation Proficiency: Expertise in creating and reviewing critical design documents such as single-line diagrams, equipment schedules, string layouts, shading analysis, and yield assessments.

  • Project Coordination: Excellent ability to liaise and coordinate effectively between design teams, operations, project delivery, and external stakeholders.

  • Problem-Solving: Strong analytical and problem-solving skills to address technical challenges and contribute to value engineering efforts.

  • Communication Skills: Exceptional verbal and written communication skills for clear stakeholder engagement and technical instruction.

Preferred Skills:

  • Experience with other relevant solar design software (e.g., PVSyst, Helioscope).

  • Familiarity with project management methodologies and tools.

  • Experience in developing and implementing design standards and quality assurance processes.

  • Knowledge of electrical engineering principles relevant to large-scale power systems.

📝 Enhancement Note: The emphasis on Revit and IFC workflows as "embedded in how you work, not an occasional tool" suggests a requirement for deep, practical integration of BIM into daily design management processes, not just basic usage. The "5-10 years" experience level implies a need for seasoned professionals capable of immediate impact and strategic contribution.

📊 Process & Systems Portfolio Requirements

Portfolio Essentials:

  • Design Management Case Studies: Examples demonstrating successful oversight and coordination of design processes across multiple commercial solar PV projects, highlighting efficiency gains or error reduction.

  • Revit & IFC Deliverables: Showcase of detailed design packages created using Revit, including 3D models, construction drawings, and coordination views that effectively integrate IFC data.

  • Technical Standard Documentation: Examples of design standards, process flows, or technical guidelines developed or improved by the candidate to ensure consistency and compliance.

  • Compliance & Regulatory Adherence: Evidence of how designs have successfully met stringent industry standards, grid codes, and regulatory requirements, perhaps through project examples or process documentation.

  • Yield Assessment & Shading Analysis: Demonstrations of comprehensive site analysis, including shading studies and energy yield predictions, with clear methodologies and actionable insights.

Process Documentation:

  • Workflow Design & Optimization: Documentation outlining the candidate's approach to designing and optimizing engineering workflows, particularly for solar PV projects, focusing on efficiency and quality control.

  • Implementation & Automation: Examples of how new processes or technologies (like BIM or specific software) were implemented to streamline design delivery and improve team collaboration.

  • Measurement & Performance Analysis: Methods used to track design performance, measure adherence to standards, and identify areas for continuous improvement in the design lifecycle.

📝 Enhancement Note: For a Design Manager role, a portfolio should reflect not just individual design capability but the ability to manage and elevate the entire design process for a team and business. This includes demonstrating strategic thinking around process improvement, standardization, and the successful application of advanced tools like Revit and IFC in a multi-project environment.

💵 Compensation & Benefits

Salary Range: Based on the role's seniority, technical expertise, management responsibilities, and location (Melton Mowbray, UK), a competitive salary range for a Design Manager with 5-10 years of experience in the renewable energy sector is estimated to be between £50,000 and £70,000 per annum. This estimate considers typical market rates for similar roles in the UK, factoring in the specialized nature of solar PV design management and the use of advanced software.

Benefits:

  • Hybrid Working Model: Offers flexibility with a balance between office-based collaboration and remote work.

  • Pension Scheme: Contributions to a company pension scheme, providing long-term financial security.

  • Holiday Allowance: Generous annual leave entitlement to support work-life balance.

  • Professional Development: Opportunities for continued learning, training, and professional certifications in solar technology and design management.

  • Company Vehicle/Allowance: Potentially offered for site visits or travel related to project coordination.

  • Health & Wellbeing Programs: Access to initiatives focused on employee health and overall well-being.

  • Life Assurance: Coverage to provide financial support for dependents.

Working Hours: The standard working hours are likely to be around 40 hours per week, with flexibility offered through the hybrid working arrangement. Expected working hours are Monday to Friday, with the possibility of occasional weekend work or extended hours during critical project phases, though this is not explicitly stated.

📝 Enhancement Note: The salary estimate is based on research of comparable Design Manager roles in the UK's renewable energy and construction sectors, considering the specified experience level and location. Benefits are inferred based on standard offerings for full-time positions in established UK companies within this industry, aiming to attract and retain skilled professionals.

🎯 Team & Company Context

🏢 Company Culture

Industry: Renewable Energy, specifically Commercial Solar PV Installation. Myriad Products operates within a dynamic and growing sector driven by sustainability goals and increasing demand for clean energy solutions. The company has over 20 years of experience, positioning it as an established player in the UK market.

Company Size: With a "small, fast-moving team" described, Myriad Products likely falls into the Small to Medium-sized Enterprise (SME) category, possibly ranging from 50-250 employees. This size typically fosters a close-knit environment where individual contributions are highly visible and impactful.

Founded: Established over 20 years ago, Myriad Products has a long track record in the renewable energy business, indicating stability, experience, and a deep understanding of the market and its evolving challenges.

Team Structure:

  • The Design function is led by this Design Manager role, suggesting a dedicated team or a matrix structure where designers report to this manager for technical oversight.

  • Close collaboration is expected with the operations and project delivery teams, indicating a cross-functional operational structure.

  • The "small, fast-moving team" implies a flat hierarchy or agile team setups, facilitating quick decision-making and direct communication. Methodology:

  • Data-Driven Design: Emphasis on yield assessments and shading analysis points to a data-driven approach in design.

  • Process Standardization: The role of maintaining and developing design standards suggests a focus on repeatable, high-quality processes.

  • Agile Execution: The "fast-moving" nature of the team and business implies an agile approach to project management and delivery, where adaptability is key.

  • Quality Assurance: A core aspect of the role involves ensuring technical rigor and compliance, indicating a strong focus on quality control throughout the design lifecycle.

Company Website: www.myriadproducts.co.uk

📝 Enhancement Note: The company context suggests a mature but agile organization. The "20+ years of experience" combined with a "small, fast-moving team" points to a company that has honed its processes but retains the ability to adapt quickly. This balance is crucial for candidates looking for both stability and dynamism.

📈 Career & Growth Analysis

Operations Career Level: This role is positioned as a Mid-Senior Level position, specifically a technical leadership role within the engineering and design operations of the company. It represents a significant step up from a Senior Solar Designer role, focusing on managing a function rather than just individual project design output. The scope involves strategic input into design standards and processes.

Reporting Structure: The Design Manager will likely report to a Director of Operations, Head of Engineering, or a similar senior leadership role within the company. They will be responsible for a team of solar designers, managing their workload, technical output, and professional development. Collaboration with project managers and site operations leads will be critical.

Operations Impact: The Design Manager plays a pivotal role in ensuring the profitability and success of commercial solar projects. High-quality, compliant, and cost-effective designs directly impact project buildability, operational efficiency, energy yield, and ultimately, the company's revenue and reputation. By standardizing processes and mitigating design risks, this role contributes significantly to predictable project outcomes and financial performance.

Growth Opportunities:

  • Leadership Development: Progression to a Head of Engineering or Director of Operations role, overseeing broader engineering and technical functions within the company.

  • Strategic Operations: Opportunity to influence company-wide operational strategy, particularly in areas of technology adoption, process innovation, and quality management within the renewable energy sector.

  • Specialization: Deepening expertise in specific areas of solar technology, grid integration, or advanced design methodologies, potentially leading to subject matter expert roles.

  • Business Development Support: Contributing technical expertise to sales and business development efforts, advising on design feasibility and project scope for new opportunities.

📝 Enhancement Note: The growth analysis emphasizes that this role is a stepping stone into broader operational leadership within the renewable energy sector. The opportunity to "set and own the design standard" is a key indicator of potential for strategic influence and career advancement beyond pure technical design.

🌐 Work Environment

Office Type: This is a hybrid role, meaning the Design Manager will spend a portion of their time working from the Myriad Products office in Melton Mowbray and the remainder remotely. The office environment is likely to be collaborative and focused, supporting the "small, fast-moving team" dynamic.

Office Location(s): The primary office location is Melton Mowbray, Leicestershire, LE13. This location is central within the UK, potentially offering good accessibility for team members and site visits across various project locations.

Workspace Context:

  • Collaborative Hub: The office space likely facilitates team meetings, design reviews, and cross-functional collaboration with operations and project delivery teams.

  • Technical Resources: Access to necessary design software (Revit, IFC tools), hardware, and potentially a knowledge base or shared documentation systems.

  • Team Interaction: Opportunities for direct engagement with colleagues, fostering a sense of team cohesion and facilitating quick problem-solving sessions.

  • Remote Flexibility: The hybrid nature allows for focused, individual work in a chosen remote environment, balanced with in-person interaction.

Work Schedule: The role is full-time, typically Monday to Friday. The hybrid arrangement allows for some flexibility in structuring the work week, balancing office days with remote working days to optimize productivity and personal needs. Core working hours are expected to be maintained for team coordination.

📝 Enhancement Note: The hybrid aspect is a key feature, catering to modern work preferences while maintaining the operational necessity of in-person collaboration for a management role. The specific office location in Melton Mowbray is important for candidates assessing commute feasibility.

📄 Application & Portfolio Review Process

Interview Process:

  1. Initial Screening: A review of CV and cover letter, focusing on direct experience in solar PV design, Revit/IFC proficiency, and any management or leadership experience.

  2. Technical Interview: In-depth discussion about solar PV design principles, compliance standards, and practical application of Revit and IFC workflows. This may involve scenario-based questions related to design challenges and project coordination.

  3. Portfolio Review & Case Study Presentation: Candidates will be asked to present examples from their portfolio, showcasing their design management capabilities, technical problem-solving skills, and process improvement initiatives. This stage will likely assess how they've managed design across multiple projects and ensured compliance.

  4. Team/Cultural Fit Interview: Meeting with key stakeholders from operations and project delivery teams to assess collaboration style, communication effectiveness, and alignment with Myriad Products' culture.

  5. Final Interview: Discussion with senior leadership to confirm suitability for the role, discuss career aspirations, and finalize terms.

Portfolio Review Tips:

  • Quantify Impact: For each portfolio item, clearly articulate the problem, your solution, and the measurable results (e.g., reduced design time by X%, improved compliance accuracy, successful integration of Y projects).

  • Showcase Management: Highlight examples where you managed design output for multiple projects, detailing your coordination strategies, quality control measures, and communication approach.

  • Demonstrate Technical Depth: Be prepared to walk through specific design elements in Revit or IFC models, explaining technical decisions, compliance considerations, and how you ensured buildability.

  • Process Improvement Focus: Include examples of how you improved design processes, standardized documentation, or implemented new workflows to enhance efficiency or quality.

  • Tailor to Myriad: Research Myriad Products' recent projects or company values and subtly align your portfolio examples to demonstrate how your skills meet their specific needs in commercial solar.

Challenge Preparation:

  • Design Scenario: Be ready to tackle a hypothetical design challenge for a commercial solar project, outlining your approach to site assessment, system design, compliance checks, and coordination.

  • Process Improvement Task: You might be asked to propose improvements to a given design process or documentation workflow. Focus on practicality, scalability, and measurable benefits.

  • Technical Compliance Questions: Prepare to answer specific questions about UK solar PV regulations, grid connection requirements, and safety standards.

📝 Enhancement Note: The emphasis on portfolio review and case study presentation is crucial for this role. Candidates should prepare to demonstrate not just technical proficiency but also their ability to manage design operations strategically, solve complex problems, and effectively communicate their expertise and impact.

🛠 Tools & Technology Stack

Primary Tools:

  • Revit: Essential for BIM modeling, detailed design documentation, and clash detection. Proficiency is expected to be advanced and integrated into daily workflows.

  • IFC Workflows: Critical for interoperability and collaboration within a BIM environment.

Understanding and application of IFC standards for data exchange are key.

  • Solar Design Software: Proficiency in industry-standard tools for shading analysis and yield assessment is required. Examples include:

    • PVSyst: Widely used for detailed energy yield simulation and performance analysis.
    • Helioscope: Popular for system design, modeling, and financial analysis of solar projects.
  • CAD Software: General CAD proficiency may be beneficial for broader design support or integration.

Analytics & Reporting:

  • Performance Tracking Tools: While not explicitly mentioned, the role requires tracking design output and quality. Familiarity with tools that can monitor project progress and key performance indicators (KPIs) is advantageous.

  • Reporting Dashboards: Ability to create or interpret reports on design status, compliance checks, and project timelines.

CRM & Automation:

  • Project Management Software: Familiarity with tools used for project tracking, task management, and team coordination (e.g., Asana, Monday.com, Jira, or industry-specific platforms).

  • Document Management Systems: Experience with systems for storing, organizing, and versioning design documents and project information.

📝 Enhancement Note: The core technical requirements revolve around advanced BIM tools (Revit, IFC) and specialized solar design software. Candidates should be prepared to discuss their practical application and how these tools contribute to efficient and compliant design delivery in a commercial context.

👥 Team Culture & Values

Operations Values:

  • Technical Excellence: A commitment to delivering high-quality, accurate, and compliant solar PV designs that stand up to rigorous scrutiny.

  • Efficiency & Optimization: A drive to continuously improve design processes, reduce waste, and maximize productivity through smart workflows and technology adoption.

  • Collaboration & Communication: Valuing open communication and effective teamwork across departments to ensure seamless project execution and problem-solving.

  • Accountability & Ownership: Taking responsibility for design outcomes, proactively addressing challenges, and driving projects to successful completion.

  • Innovation: An openness to new technologies, methodologies, and approaches that can enhance design quality and project delivery in the renewable energy sector.

Collaboration Style:

  • Cross-Functional Integration: Working closely with project delivery, operations, and potentially sales teams to ensure design aligns with project constraints, client needs, and business objectives.

  • Proactive Engagement: Regularly engaging with other teams to share design updates, solicit feedback, and resolve technical queries promptly.

  • Knowledge Sharing: Fostering an environment where design insights and best practices are shared across the team and the wider organization.

  • Constructive Feedback: Participating in and providing constructive feedback during design reviews and value engineering sessions to drive continuous improvement.

📝 Enhancement Note: The culture emphasizes a blend of technical rigor and operational efficiency, typical of successful engineering and project delivery organizations in the construction and renewable energy sectors. The "small, fast-moving team" suggests a dynamic and hands-on approach to collaboration.

⚡ Challenges & Growth Opportunities

Challenges:

  • Managing Multiple Concurrent Designs: Balancing the demands of several complex commercial solar projects simultaneously, ensuring no compromise on quality or timelines.

  • Keeping Pace with Regulations: Staying current with evolving solar PV standards, grid codes, and building regulations in the UK and ensuring designs consistently meet these requirements.

  • Integrating New Technologies: Evaluating and integrating new solar technologies, design tools, or construction methods into existing workflows effectively.

  • Bridging Design & Delivery Gaps: Ensuring smooth and accurate handover from design to construction, minimizing on-site issues arising from design discrepancies or omissions.

  • Resource Management: Effectively managing the design team's workload and resources to meet project demands within budget and time constraints.

Learning & Development Opportunities:

  • Advanced BIM & Design Techniques: Opportunities to deepen expertise in Revit, IFC, and other advanced design software, potentially leading to BIM management roles.

  • Renewable Energy Sector Specialization: Further developing knowledge in areas like energy storage integration, grid connection complexities, or specific solar technologies.

  • Operational Leadership Training: Developing skills in team management, process improvement methodologies (e.g., Lean, Six Sigma), and strategic planning.

  • Industry Conferences & Certifications: Access to relevant industry events, training programs, and professional certifications to enhance technical and managerial capabilities.

  • Mentorship: Potential for mentorship from senior leaders within Myriad Products, offering guidance on career progression and operational strategy.

📝 Enhancement Note: The challenges listed are typical for a leadership role in a fast-paced design and engineering environment. The growth opportunities are geared towards developing both technical specialization and broader operational leadership within the renewable energy sector.

💡 Interview Preparation

Strategy Questions:

  • Design Management Strategy: "How would you approach establishing and maintaining consistent design standards across a portfolio of 5-10 commercial solar PV projects simultaneously?" (Focus on your process for quality control, team oversight, and documentation.)

  • Technical Compliance Approach: "Describe a situation where you had to ensure a complex design met stringent regulatory or grid connection requirements. What steps did you take, and what was the outcome?" (Highlight your understanding of compliance and problem-solving.)

  • BIM Implementation: "Beyond basic modeling, how do you leverage Revit and IFC workflows to improve collaboration, reduce clashes, and enhance the constructability of solar PV designs?" (Demonstrate practical, advanced application of BIM.)

Company & Culture Questions:

  • Company Vision: "Based on your understanding of Myriad Products, how do you see the role of design management contributing to the company's growth and success in the commercial solar market?" (Show your research and strategic thinking.)

  • Team Collaboration: "Describe your ideal working relationship with project delivery and operations teams. How would you foster effective communication and collaboration between design and these departments?" (Assess your teamwork and communication style.)

  • Impact Measurement: "How would you measure the success and impact of the design function at Myriad Products? What KPIs would you track?" (Demonstrate your focus on results and operational metrics.)

Portfolio Presentation Strategy:

  • Narrative Structure: For each case study, use a STAR (Situation, Task, Action, Result) format. Clearly articulate the project context, your specific role and responsibilities, the actions you took, and the quantifiable results achieved.

  • Visual Aids: Utilize screenshots from Revit models, diagrams, or charts to illustrate your points. Ensure they are clear, concise, and directly relevant to the discussion.

  • Focus on Management: Emphasize your role in coordinating design efforts, managing timelines, ensuring quality, and collaborating with others, not just your individual design contributions.

  • Process Improvement Highlight: If you have examples of process improvements you've implemented, dedicate time to explain the 'before' and 'after,' focusing on the benefits gained.

  • Q&A Readiness: Anticipate questions about your technical decisions, challenges faced, and how you handled them. Be prepared to discuss alternatives and lessons learned.

📝 Enhancement Note: Interview preparation should focus on demonstrating both technical depth in solar PV design and management capabilities. Candidates need to articulate their strategic thinking regarding process, compliance, and team collaboration, backed by concrete examples from their portfolio.

📌 Application Steps

To apply for this Design Manager position:

  • Submit your application through the provided link on the Zoho Recruit portal.

  • Portfolio Customization: Prepare a portfolio that specifically highlights your experience in managing commercial solar PV design projects, showcasing your proficiency with Revit and IFC workflows, and demonstrating your ability to ensure compliance.

  • Resume Optimization: Tailor your resume to emphasize your experience in technical leadership, design management, construction industry design, and your specific skills in solar PV design, Revit, and IFC. Quantify achievements wherever possible.

  • Interview Preparation: Practice articulating your experience using the STAR method, prepare specific examples for common interview questions related to design management, compliance, and collaboration, and be ready to present your portfolio with confidence.

  • Company Research: Thoroughly research Myriad Products' history, projects, and values. Understand their position in the commercial solar market and how your role as Design Manager will contribute to their objectives.

⚠️ Important Notice: This enhanced job description includes AI-generated insights and operations industry-standard assumptions. All details should be verified directly with the hiring organization before making application decisions.


Application Requirements

Candidates must have proven design experience within the construction industry and strong proficiency in Revit and IFC-based workflows. A background in commercial solar PV design and the ability to manage technical standards across multiple concurrent projects are essential.